Work Done from July 2024 to December 2024
-
Sand, Fare, paint bottom, prop speed, all bottom zincs
-
Sand, fare, paint bottom hull/house below brow & entire main deck & cockpit
-
Replace pss prop shaft seals, rudder seals/remove clean props
-
Replace cutlass bearings
-
Install Chirp transducer
-
Replace rudder flange bearings
-
Replace rudder seals
-
Refiberglass rudder throughhull
-
Replace rudder lower bearings
-
Pressure clean lazarette
-
Compound & wax flybridge & hardtop
-
Restore aft deck teak steps and ladder
-
Complete service all chillers
-
All new helm and flybridge with NEMA 2000 electronics
-
(navigation, GPS, autopilot, radar, vhf, transducer, AIS)
-
New Panels for helm and flybridge displays/cover holes-fiberglass
-
All new TVs and soundbars in staterooms and salon (3)
-
New aft deck and engine room cameras, and NVR
-
New StarLink
-
All new carpet and padding throughout
-
New salon couch, chairs, etc.
-
New salon coffee table and salon decor
-
All new linens & bedding for staterooms and heads
-
Both engine and generator 2000 hr. service
-
New vessel tools and maintenance equipment
-
New salon and pilothouse A/C pumps
-
Reupholster main helm dash
-
Replace all halogen lights w/ LED
-
All new galley cutlery glass ware and countertop appliances
-
New 6 man life raft
-
Davit Cylinder Rebuild-Rotator-Cable up/down
Work Done from February 2025 to May 2025
-
Flybridge Interior/Exterior paint-Hardtop-Various glass repairs
-
Remove and Replace (2) underwater lights-Labor Only
-
New Underwater Lights
-
Full Exterior Detail
-
Load test -Davit
-
Replace/Install – 3 Flood Lights- Flybridge and Aft to Cockpit
-
3 Flood Lights- Lights only
-
Re-Upholster Flybridge aft bench
-
Replace Auto Anchor display-Flybridge
-
Repair (2) areas-Stanchions-repair fiberglass on swim platform